Workeros — Baseline & Acceptance Checklist

The shared contract. Left = the real baseline (main, evidence not memory). Right = the target (the good reference). Below = the acceptance checklist; edit it, then it's what "done" means and what I gate every step against.
The finding: main is the right base — already soft corners + no Secrets sidebar. It needs exactly 4 render-fixes (Emily→Radar, remove banner, remove Floom logo, show Brain dropzone) + the ~20 open feature PRs applied on top. No boxy --radius-ui (that was only the staging branch).

Overview

BASELINE — main (what we build on)
TARGET — the good reference
corners soft ✓no Secrets ✓Emily Star → Radarremove Floom logo

Brain

BASELINE — main (what we build on)
TARGET — the good reference
corners soft ✓no Secrets ✓remove bannershow dropzone

Acceptance checklist — "done" means all of these

DESIGN — must match the reference

FEATURES — must be present + working (the open PRs)

PROCESS GATES (so it can't silently regress)